Disaster Plan Essay

1163 words - 5 pages

Abstract:
In the situation of XYZ computers flooding, this paper is to help create a disaster plan using different raid setups that might better help this company in the long run to back up there systems. I have gone into detail what is needed for the different raid systems and what they are good for below.

The first step in making sure that you have a stable system is to make sure that you have a proper back up plan, especially when you are dealing with the amount of employees that XYZ Computers has to deal with on a day to day basis. When starting out a disaster plan, we need to take in every possible situation that could arise, from natural disasters to think such as hacker exploits ...view middle of the document...

The flooding has caused damage to computers on the first floor level of the building. The first thought that I have when taking a look at XYZ computers situation was that they had put the servers on the first floor. I just don’t think any company should do this, I would say the smarter idea would be to put the servers in a secluded area that would still be accessible by the IT administrators for maintenance work, but would still be safe from things such as flooding. The other option that should have been put into would be a raid setup.
There are 3 different broad ideas when it comes to RAID: reverberating, once is the replacement of data to more than one hard drive; marking, once is the disserving of date over multiple hard drives, and finally error rectification, where all the extra data is stored allowing the data to be observed and most likely determined, also known as error tolerance. The main point of raid is to help enhance the dependability of the drives, helping to safeguard the information that is very important to businesses.
There are a few different types of raid setups that we can work with. I would say the best option for this company would be to use a RAID 5 setup. This type of setup requires all drives to be present while the system is up and running, but if something where to fail due to flooding or a hardware failure, you would only need to replace the failed hard drive instead of having to replace the whole entire system. Another form of raid system that would be ideal for this would be a raid 1 based system. Raid 1 is a mirroring arrangement of hard disks inside the computer. What this means is that instead of the computer writing to a single hard drive, it will write to both, or as many hard drives you have in the server computer at the same time, this way if there is ever some type of hardware failure, or computer virus failure, then you have an exact copy of the system on a secluded hard drive. This will allow you to just switch out hard drives, and keep things up and running. You could also use a RAID 0. You can use this in a stripped set, once is like a RAID 1 but with less error tolerance. Any type’s disk incapability will completely kill the system. We...

Other assignments on Disaster Plan

7 Domains Of It Infrastructure Essay

263 words - 2 pages Purpose Business Continuity / Disaster Recovery program is implemented to ensure that ITT-Tech capability to respond to and reduce the effect(s) of incidents that may impact the ability of one or more of the of it’s locations ability to carry out normal activities. Business Continuity and Disaster Recovery Plans shall identify and address critical events that have the potential to cause materially adverse consequences. Scope The

Labs Rto Essay

358 words - 2 pages The purpose of a business continuity and disaster recovery plan is to document all identified mission-critical IT systems, applications, and data recovery procedures. Fast recovery times for IT systems and applications are achievable with efficient and accurate recovery instructions. In this lab, you applied the same concepts of disaster recovery backup procedures and recovery instructions to your own data. You explained how you can lower RTO

Business Continuity Plan

8008 words - 33 pages A. Introduction 12 B. Business Function Recovery Priorities 12 C. Relocation Strategy and Alternate Business Site 12 D. Recovery Plan Phases 13 1. Disaster Occurrence 13 2. Plan Activation 13 3. Alternate Site Operations 13 4. Transition to Primary Site 13 E. Vital Records Backup 13 F. Restoration of Hardcopy Files, Forms, and Supplies 14 G. On-line Access to <ORGANIZATION NAME> Computer Systems 14 H. Mail and Report

Dlis Risk Managment Analysis Outline

532 words - 3 pages - Organizational risk as a whole, funding for project. C. Risk Manager – Development and implementation of Risk management plan. D. Audit Team – Internal audits, scheduling of external audits, compliance with laws. Schedule for planning process: Rough Draft – 01/15/2014 Risk Assessment Plan – 01/25/2014 Risk Mitigation Plan – 02/05/2014 Business Impact Analysis Plan – 02/11/2014 Disaster Recovery Plan – 02/25/2014 Response Team Plan

Drp Exam

5034 words - 21 pages . Differential backup C. Incremental backup 4 D. Full backup 24. Which of the following is not essential when planning a backup strategy? A. Selecting a media supplier B. Managing the backup media C. Tracking the location of all backup media D. Providing mechanisms to duplicate sets of backed-up data so that while a copy remains onsite, another copy can be taken offsite for disaster protection 25. Which phase of the BCP process describes plan

Community Organizing

1479 words - 6 pages training and recognition. 3. Implementation Put design plans into action a) Generate broad citizen participation. b) Develop a sequential work plan. c) Use comprehensive, integrated strategies. d) Integrate community values into the programs, materials and messages. 4. Program Maintenance – Consolidation The program at this point has experienced some degree of success and has weathered through implementation problems

Community And Population Health

1116 words - 5 pages fill all the roles at the time of an emergency. Taking training classes in emergency or disaster preparedness would also help. Making sure there are always supplies stocked and ready at any time is essential. Knowing where the supplies are will help with fast access. It is very important to have a plan prepared along with a backup plan. Knowing who and where to report to if a disaster occurs is also helpful. Having a list of names and numbers of all kinds of resources will be beneficial in helping the victims. Being prepared, willing, and knowledgeable is the difference between a successful relief effort and a chaotic relief effort.

Change

551 words - 3 pages may happen within the economy, with the workers inside the organization, and have a plan for any type of natural disaster that can happen. Contingency planning is done in all good organizations. References Burke, W. (2008). Organization change: Theory and practice, Sage Publications, Inc. Jamison, C. (2001). Passion and practice: Change agents living in an organization. The Journal for Quality and Participation, 24(1), 34-38.

Project

2541 words - 11 pages Analysis of Uttarakhand Floods as to what are the reasons why it happened Flash floods warnings unheeded: Geologists Geologists had repeatedly warned that sedimentary rock structure of the Himalayas comprising shale and siltstone is extremely pliable and construction of structures close to the rivers is a precursor for disaster Several Himalayan geologists have repeatedly expressed apprehension against the massive road  and dam-building

Week 4

303 words - 2 pages The Chilean mine disaster of 2010 was one of the most riveting stories of the year. Most of this was due to the fact officials worked quickly and effectively in providing necessary supplies to the trapped miners. They put a plan in place and implemented it as needed. They made sure they allowed for open communication between, the miners, families, employees of the company and media at large. Therefore, communications between parties was

Mgt 350 Week 3

709 words - 3 pages to none. They provide health care to their employees that are kept at a very low affordable amount. There are many issues for the island of Kava. For one, the island of Kava is a disaster waiting to happen, environmentally and economically. This island seems to have most of world’s issues all in one. The environmental issues are many. Tidal waves, tsunamis, typhoons, hurricanes tornadoes, floods, fires, volcanic eruptions and earthquakes are the

Similar Documents

Disaster Assess E T And Recovery Plan

436 words - 2 pages Disaster assessment and recovery plan Robert Favinger Everest University Disaster assessment and recovery plan A small convenience store recently suffered an unforeseen incident arising from the carelessness of one of its customers. This resulted in a lot of damage in terms of people, building damage, stocks and utilities and a temporary halt to normal business operations (Walzer, 2009). The incident caused a lot of panic among shoppers

Assignment 4: Disaster Recovery Team

958 words - 4 pages Officer * Network Services Recovery Data Networks - Recovery of voice and data network infrastructure. Includes recovery of hardware components, connectivity to the recovery site and recovery of critical network software. * Server Recovery Technical Services - Recovery of critical servers. (Seaton, 2013) (txc.com, 2013) Activation of Plan of Disaster Recovery Plan The organizations CEO, an appointee, or successor may activate this plan

Contingency Plans Essay

968 words - 4 pages SERT. The CEMP ensures that all levels of government are able to mobilize as a unified emergency organization to safeguard the well-being of the state’s residents and visitors (Florida Disaster, 2016). CEMP provides a framework which doesn’t depend on any particular individual or situation but adjustable to the situation. A disaster contingency plan is prepared in every organization to respond to an emergency and the impact it can have to the

Lab 3.2 Essay

1291 words - 6 pages landscape in which the organization operates, Evaluation argues the opposite. What is the difference between a Disaster Recovery Plan and a Business Continuity plan? A disaster recovery plan is a documented process or set of procedures to recover and protect a business IT infrastructure in the event of a disaster. Such plan, ordinarily documented in written form, specifies procedures an organization is to follow in the event of a disaster. Business